Product Detail :
|
Widening and strengthening of the existing approach road from digdole (zero chainage at NH-44) to bajmasta (km 0.00 to km 9.80) in connection with construction of new adit at urnihal to the tunnel T-49 A on banihal section of USBRL project. (Package DGL-BJM adit Rd-R).
|